![]() |
BHARAT HEAVY ELECTRICALS LIMITED
|
Commissioned Sets in PSER
| 500 MW SETS (PS) 250 MW SETS (PS) 210 MW SETS (PS) 120 MW SETS (PS) 110 MW SETS (PS) 67.5 MW SETS (PS) 45 MW/40 MW/30 MW/12 MW SETS (IS) 120 MW/70 MW GT SETS (IO) 33.5 MW AND LESS GT/CCP SETS (PS/IS) HYDRO SETS (PS) |