(TENDER
NO :PSER:PUR:PMX:204(V):153
DATED :
06/02/2012)
SUPPLY
OF ORDINARY PORTLAND CEMENT (OPC) GR-43 AS PER IS:8112, AT 2X500 MW
MARWA THERMAL POWER STATION OF CSPGCL, CHHATTISGARH (5500MT +/-30%).
|
|
(TENDER
NO :PSER:SCT:BAR:M1288:11 DATED :
24/01/2012)
APPLICATION
OF INSULATION ETC ON STEAM GENERATOR AND ITS AUX.,TG PIPING,TG AUX.,
BOILER INTEGRAL PIPINGS, VALVES, VESSELS, POWER CYCLE PIPING, HEAT
EXCHANGERS, GLAND COOLERS, PUMPS, D/A, FST INCLUDING SUPPLY AND
APPLICATION OF PAINTS, ETC FOR 2 X 660 MW, STAGE-II (2 UNITS) BARH
PROJECT IN BIHAR.
|
|
(TENDER
NO : PSER:SCT:SDG-B1306:12
DATED : 24/01/2012)
(I)PACKAGE-A:
ERECTION, TESTING, COMMISSIONING ETC OF BOILER & AUXILIARIES
OF 1X500 MW UNIT#3 FOR 2X500 MW UNITS AT SAGARDIGHI STPP,WB
AND(II)PACKAGE-B:ERECTION,TESTING,COMMISSIONING ETC OF BOILER &
AUXILIARIES OF 1X500 MW UNIT#4 FOR 2X500 MW UNITS AT
SAGARDIGHI STPP,WB.
|
|
(TENDER
NO : PSER:SCT:MUZ-M1294:2678
DATED : 24/01/2012)
DESIGN,
ENGINEERING, MANUFACTURING, SUPPLY, ERECTION AND COMMISSIONING, ETC
OF COMPRESSED
AIR SYSTEM
FOR 2X195
MW
KBUNL
MUZAFFARPUR TPS.
|
|
(TENDER
NO :PSER:PUR:PMX:131(II):146
DATED :
24/01/2012)
SUPPLY
OF VARIOUS INDUSTRIAL GASES (CO2) AT BHEL:PSER’S MAITHON SITE
.
TCN-01
DATED : 30/01/2012
|
|
(TENDER
NO :PSER:PUR:
MSX:155(VIII) :143
DATED :
20/01/2012)
AMC
CONTRACT FOR VIRUS PROTECTION AND MAINTAINING ANTI-SPAMMING
ENVIRONMENT AT BHEL PSER HQ & SITES
.
|
|
(TENDER
NO : PSER:PUR:
MSX: 184(III) :144 DATED :
20/01/2012)
ANNUAL
MAINTENANCE SERVICES FOR PIS, FINANCE, TMS, PAYROLL AND SOMS
SOFTWARE for PSER, PSSR, PSNR, PSWR & PS-HQ
.
TCN-01
DATED : 03/02/2012
|
|
(TENDER
NO : PSER:PUR:
MSX:218 :145 DATED :
20/01/2012)
RATE
CONTRACT FOR FIXING SECONDARY SERVICE PROVIDER TO SETUP MPLS WIDE
AREA NETWORK (WAN) ACROSS ENTIRE BHEL LOCATIONS
.
TCN-01
DATED : 27/01/2012
TCN-02
DATED : 07/02/2012
|
|
(TENDER
NO : PSER:SCT:
VIZ-T1305:2673
DATED :
18/01/2012)
PACKAGE-A
ERECTION AND COMMISSIONING OF 520 MW STEAM TURBINE, GENERATOR,
PUMPS, AUXILIARIES, PIPING, ETC OF UNIT#1 ALONG WITH COMMON SYSTEM
EQUIPMENTS FOR BOTH UNITS. PACKAGE-B
ERECTION AND COMMISSIONING OF 520 MW STEAM TURBINE, GENERATOR,
PUMPS, AUXILIARIES, PIPING, ETC OF UNIT#2.
TCN-01
DATED : 07/02/2012
|
|
(TENDER
NO : PSER:SCT:SNX-C1304:12
DATED : 18/01/2012)
CONSTRUCTION OF OFFICE BUILDING (3MX27MX12M), MESS
BUILDING , 500 NOS OF RCC SLEEPERS , 45000-SQM – HARD SURFACING
& 1500MX6M ROADS WITHIN STORE, 800M X 2M HIGH GI CHAIN LINK
FENCING ETC. MISC. ENABLING CIVIL, ELECTRICAL WORKS AT 2X150
MW SYNTAX INFRA BTG PROJECT , MAHARASHTRA .
TCN-01
DATED : 07/02/2012
|
|
(TENDER
NO : PSER:SCT:BRM-C1303:11
DATED : 13/01/2012)
PILING, CIVIL, STRUCTURAL AND ARCHITECTURAL WORK ETC. OF
‘COAL HANDLING PLANT’ PACKAGE AND ‘ASH HANDLING PLANT’
PACKAGE FOR 2X 250MW UNITS AT
BARAUNI TPP,BEGUSARAI, BIHAR.
TCN-01
DATED : 27/01/2012
TCN-02
DATED : 02/02/2012
TCN-03
DATED : 04/02/2012
TCN-04
DATED : 06/02/2012
|
|
(TENDER
NO : PSER:SCT:DPL-M1299:11
DATED : 13/01/2012)
DESIGN,
FABRICATION, MANUFACTURING, INSPECTION & TESTING, PAINTING,
SUPPLY/DELIVERY DULY PACKED AT PROJECT
SITE INCLUDING FREIGHT,
SUPPLY OF
CONSUMABLES, START-UP & COMMISSIONING SPARES,
SPECIAL TOOLS & TACKLES FOR
MAINTENANCE FOR SIDE STREAM FILTRATION
SYSTEM FOR 1X250 MW UNIT AT DPL, DURGAPUR, WEST BENGAL.
TCN-01
DATED : 03/02/2012
|
|
(TENDER
NO : PSER:PUR:PMX:203(III):142
DATED : 12/01/2012)
SUPPLY
OF OPC GR-43 AS PER IS:8112 – 6000 MT +/- 30% FOR PALATANA PROJECT
OF BHEL.
|
|
(TENDER
NO : PSER:SCT:DPL- M1300:11.
DATED : 09/01/2012)
PACKAGE-1
: DESIGN, FABRICATION , MANUFACTURING , INSPECTION AND TESTING
, PAINTING , SUPPLY / DELIVERY DULY PACKED AT PROJECT SITE INCLUDING
FREIGHT , INCLUDING SUPPLY OF CONSUMABLES , START UP
& COMMISSIONING SPARES , SPECIAL TOOLS
& TACKLES FOR MAINTENANCE
FOR COOLING WATER TREATMENT PLANT AT 1X250 MW
EXTENSION UNIT
NO. 8 , DURGAPUR .
PACKAGE-2
: DESIGN , FABRICATION , MANUFACTURING , INSPECTION AND TESTING ,
PAINTING , SUPPLY / DELIVERY DULY PACKED AT PROJECT SITE INCLUDING
FREIGHT INCLUDING SUPPLY OF CONSUMABLES,
START
UP & COMMISSIONING
SPARES , SPECIAL TOOLS & TACKLES FOR MAINTENANCE
FOR CW CHLORINATION PLANT , AT 1X250 MW EXTENSION UNIT NO. 8 ,
DURGAPUR
TCN-01
DATED : 31/01/2012
TCN-02
DATED : 06/02/2012
|
|
(TENDER
NO : PSER:SCT:
BRM-C1302:11
DATED : 03/01/2012)
CIVIL,
STRUCTURAL AND ARCHITECHTURAL WORKS INCLUDING PILING AND GROUND
IMPROVEMENT FOR CWPH, FOREBAY AND CHANNEL, CLARIFIED WATER PH AND
RESERVOIR, RAW WATER RESERVOIR, RAW WATER
PUMP
HOUSE,
ADMINISTRATIVE
BUILDING,
WORK
SHOP,
CABLE/PIPE
RACKS,
CABLE TRENCHES,
ROAD
AND
DRAINS,
HYDROGEN
GENERATION PLANT, CANTEEN,
DG
BUILDING, CAR
PARKINGWITH
OPEN
AREA, FIRE
WATER
PUMP
HOUSE,
FIRE
STATION,
CHEMICAL
LAB, STORE, PRESSURING
&
HEATING
PH,
FOAM
PUMP HOUSE,
FUEL OIL
UNLOADING AREA, FO TANK FDN AND DYKE &
FUEL OIL
TANK
FARM
AREA,
DM
PLANT
SHED,
CW
TREATMENT
AREA,
CHLORINATION BUILDING,
WATCH
TOWER,
PTP,
ETPAND
STP(EXCLUDING POWER BLOCK,CHIMNEY AND COOLING
TOWER)
FOR 2 X 250 MW
BARAUNI
THERMAL
POWER
STATION (EXTENSION PROJECT),UNIT#8& 9 BEGUSARAI,
BIHAR AND BALANCE CIVIL WORKS FOR BOILER AUXILIARIES FOUNDATION FOR
R & M JOB OF 2 X 110 MW BARAUNI THERMAL POWER STATION,BIHAR.
TCN-01
DATED : 11/01/2012
TCN-02
DATED : 19/01/2012
|
|
(TENDER
NO : PSER:SCT:SDG-F1296:11
DATED : 03/01/2012)
HIRING
OF 1 (ONE) NOS. 150MT CLASS HEAVY LIFT CRAWLER CRANE FOR 2X500MW
SAGARDIGHI TPS, MURSHIDABAD, WEST BENGAL.
TCN-01
DATED : 24/01/2012
|
|
(TENDER
NO : PSER:SCT:SDG-M1295:11
DATED : 02/01/2012)
DESIGN,
ENGINEERING, MANUFACTURING, SUPPLY
OF MATERIAL, FABRICATION, TESTING AT MANUFACTURER’S/
SUB-VENDOR’S WORKS, PAINTING, INSPECTION, FORWARDING, DELIVERY,
COMPLETE ERECTION AND COMMISSIONING OF COMPRESSED AIR SYSTEM FOR
2X500 MW UNIT-3&4 AT SAGARDIGHI STPP, WEST BENGAL.
TCN-01
DATED : 19/01/2012
TCN-02
DATED : 27/01/2012
|
|
(TENDER
NO : PSER:PUR:PMX:149(XII):139
Dated 02/01/2012)
415V
800AMPS LT-KIOSK (FOUR NOS.) WITH ACCESSORIES AS
PER SPECIFICATION FOR BHEL:SINTEX INFRA SITE.
|
|
(TENDER
NO : PSER:PUR:PMX:189(X):138
Dated 02/01/2012)
30M
HIGH MAST LIGHTING SYSTEM (5 NOS.) WITH ACCESSORIES AS PER
SPECIFICATION FOR BHEL:SINTEX INFRA SITE.
TCN-01
DATED : 06/01/2012
|
|
(TENDER
NO : PSER:
PUR: HR: 146: 136
Dated 28/12/2011)
RECTIFICATION/REPAIR
OF FIRE HYDRANT SYSTEM INCLUDING (01) ONE NO HYDRANT POST BY
PROVIDING REQUIRED SPARES AT BHEL: PSER: HEAD QUARTER.
TCN-01
DATED : 12/01/2012
TCN-02
DATED : 24/01/2012
TCN-03
DATED : 27/01/2012
|
|
(TENDER
NO : PSER:SCT:
LPT-I1297:11 DATED : 29/12/2011)
ERECTION, TESTING, COMMISSIONING ETC OF COMPLETE C&I SYSTEM
INCLUDING ALL MAX SYSTEM & PANELS , MMI SYSTEM FOR GT, STG, SG
AND STATION C&I, ETC FOR 53 MW LEPETKATA CCPP , ASSAM .
TCN-01
DATED : 06/01/2012
TCN-02
DATED : 12/01/2012
TCN-03
DATED : 16/01/2012
TCN-04
DATED : 25/01/2012
TCN-05
DATED : 01/02/2012
TCN-06
DATED : 03/02/2012
|
|
(TENDER
NO : PSER:PUR:PMX:227(IV):133
Dated 28/12/2011)
SUPPLY
OF PORTLAND SLAG CEMENT (PSC) AS PER IS-455-1989 AT 1X250MW DURGAPUR
PROJECT LIMITED AT DURGAPUR, WEST BENGAL (2750MT +/-30%).
TCN-01
DATED : 10/01/2012
|
|
(TENDER
NO : PSER:PUR:PMX:
181(VII):132
Dated 28/12/2011)
SUPPLY
OF PORTLAND SLAG CEMENT (PSC) AS PER IS-455-1989 AT 3X18 MW POWER
& BLOWING STATION, SAIL IISCO STEEL PLANT AT DIST-BURNPUR, WEST
BENGAL (2350MT +/-30%).
TCN-01
DATED : 10/01/2012
|
|
(TENDER
NO : PSER:PUR:PMX:205(VII):131
Dated 28/12/2011)
SUPPLY
OF
ORDINARY PORTLAND CEMENT (OPC) GR-43 AS PER IS:8112 AT
1X500 MW KORBA WEST THERMAL POWER STATION OF CSPGCL AT
CHHATTISGARH, (3000MT
+/-30%) ON ‘F.O.R’ SITE BASIS.
TCN-01
DATED : 10/01/2012
|
|
(TENDER
NO : PSER:PUR:PMX:193(XII):134
Dated 28/12/2011)
SUPPLY
OF ORDINARY PORTLAND CEMENT (OPC) GR-43 AS PER IS:8112 AT
2X500 MW KODERMA THERMAL POWER STATION OF DVC AT TILAIYA, UNIT-1
& 2, DIST-KODERMA, JHARKHAND (900 MT +/-30%).
|
|
(TENDER
NO : PSER:SCT:
BRM-C1292:11 DATED : 22/12/2011)
CONSTRUCTION
OF 275 M HIGH RCC TWIN
FLUE STEEL
LINED CHIMNEY INCLUDING PILLING , SUPPLY & INSTALLATION
OF STACK ELEVATOR
& ELECTRICAL ITEMS FOR
2X250 MW BARAUNI
EXTENSION PROJECT UNIT # 8 & 9 AT
BEGUSARAI , BIHAR .
TCN-01
DATED : 11/01/2012
TCN-02
DATED : 21/01/2012
|
|
(TENDER
NO : PSER:SCT:SDG-M1286:11
DATED : 21/12/2011)
DESIGN
, ENGINEERING, MANUFACTURING,
SUPPLY/ DELIVERY, STORAGE &
HANDLING, ERECTION, COMMISSIONING, TRIAL RUN, HANDING OVER TO
CUSTOMER ETC OF VENTILATION SYSTEM FOR 2X500 MW UNIT AT
SAGARDIGHI STPP, WB.
TCN-01
DATED : 06/01/2012
TCN-02
DATED : 11/01/2012
|
|
(TENDER
NO : PSER: SCT:BRM-M1287:11
DATED : 21/12/2011)
DESIGN,
ENGINEERING, SUPPLY OF MATERIAL , FABRICATION ,
INSPECTION AND TESTING AT VENDOR’S / SUB-VENDORS WORK OR AT SITE, PAINTING ,
FORWARDING DELIVERY AT SITE , ERECTION & COMMISSIONING
INCLUDING COMMISSIONING SPARES OF
2 (TWO) MISC. TANK FOR 2X250 MW BARAUNI EXTENSION PROJECT,
UNIT 8 &
9 AT BEGUSARAI, BIHAR .
TCN-01
DATED : 11/01/2012
TCN-02
DATED : 19/01/2012
TCN-03
DATED : 25/01/2012
|
|
(TENDER
NO : PSER:
PUR:TSX:110(II):129Dated 19/12/2011)
SUPPLY
ETC. OF ONE (01) NO. “PORTABLE FLUE GAS ANALYSER” FOR TSX
DEPARTMENT : BHEL:PSER:KOLKATA.
|
|
(TENDER
NO : PSER:
PUR:TSX:108(II):128Dated 19/12/2011)
SUPPLY
ETC. OF ONE (01) NO. “PORTABLE OXYGEN ANALYSER” FOR TSX
DEPARTMENT : BHEL:PSER:KOLKATA.
|
|
(TENDER
NO : PSER:
PUR:TSX:107(II):127Dated 19/12/2011)
SUPPLY
ETC. OF SUPPLY ETC OF FOUR (04) NOS. “DIGITAL
OSCILLOSCOPE” FOR TSX DEPARTMENT : BHEL:PSER:KOLKATA.
TCN-01
DATED : 22/12/2011
|
|
(TENDER
NO : PSER:
PUR:TSX:058(IV):126Dated 19/12/2011)
SUPPLY
ETC. OF SIX (06) NUMBERS “DIGITAL mA TONG TESTER”” FOR TSX
DEPARTMENT : BHEL:PSER:KOLKATA.
|
|
(TENDER
NO : PSER:
PUR:TSX:059(V):125Dated 19/12/2011)
SUPPLY
ETC. OF EIGHT (08) NOS. “NON CONTACT TACHOMETER” FOR TSX
DEPARTMENT : BHEL:PSER:KOLKATA.
|
|
(TENDER
NO : PSER:
PUR:TSX:106(II):124Dated 19/12/2011)
SUPPLY
ETC. OF TWO (02) NO. “PORTABLE HAND HELD DIGITAL LUX METER” FOR
TSX DEPARTMENT : BHEL:PSER:KOLKATA.
|
|
(TENDER
NO : PSER:
PUR:TSX:079(III):123
Dated 19/12/2011)
SUPPLY
ETC. OF FOUR (04) NOS. “mV-mA CALIBRATOR” FOR TSX DEPARTMENT:
BHEL:PSER:KOLKATA.
|
|
(TENDER
NO : PSER:
PUR:TSX:066(VI):122
Dated 19/12/2011)
SUPPLY
ETC. OF FOUR (04) NOS. “NON-CONTACT TYPE THERMOMETER” FOR TSX
DEPARTMENT: BHEL:PSER:KOLKATA.
|
|
(TENDER
NO : PSER:
PUR:TSX:036(V):121
Dated 19/12/2011)
SUPPLY
ETC. OF EIGHT (08) NOS. “DIGITAL TONG TESTER” FOR TSX
DEPARTMENT: BHEL:PSER:KOLKATA.
|
|
(TENDER
NO : PSER:
PUR:TSX:034(V):120
Dated 03/09/2011)
SUPPLY ETC. OF EIGHT NOS. “DIGITAL MULTIMETER (THREE &
HALF DIGIT)” FOR TSX DEPARTMENT : BHEL:PSER:KOLKATA.
|
|
(TENDER
NO : PSER:
PUR:TSX:101(III):119
Dated 19/12/2011)
SUPPLY ETC OF THREE (03) NOS. “FIRE RESISTANT FLUIDS
(FRF) FILTRATION TROLLEY” AT BHEL:SITES (MARWA, KODERMA &
MAITHON).
|
|
(TENDER
NO : PSER:
PUR:TSX:031(VII):118
Dated 19/12/2011)
SUPPLY
ETC. OF ONE (01) NO. “DIGITAL INSULATION TESTER (10KV)” FOR TSX
DEPARTMENT: BHEL:PSER:KOLKATA.
|
|
(TENDER
NO : PSER:
PUR:TSX:073(III):117 Dated 19/12/2011)
SUPPLY
ETC. OF THREE (03) NOS. OIL FILTRATION UNIT FOR BHEL:PSER:PSER’S
SITES (IISCO-BURNPUR, KODERMA AND MARWA SITE - ONE OIL FILTRATION
UNIT FOR EACH SITE).
|
|
(TENDER
NO : PSER: PUR:TSX:072(III):116
Dated 19/12/2011)
SUPPLY ETC OF THREE -03- NOS. LOW VACCUM DEHYDRATION UNIT
AT BHEL: SITES KODERMA, IISCO- BURNPUR AND MARWA.
|
|
(TENDER
NO : PSER:PUR:PMX:239(II):114
DATED : 19/12/2011)
SUPPLY
OF PORTLAND SLAG CEMENT –PSC-, AS PER IS 455-1989TO BHEL SITE
OFFICE, 2X250MW EXTENSION PROJECT,BARAUNI TPS, BEGUSARAI, BIHAR -
851116, 5000MT PLUS AND MINUS 30 PERSENT.
|
|
(TENDER
NO : PSER:SCT:KBA:I1289:11 DATED :
16/12/2011)
ERECTION,
TESTING, COMMISSIONING ETC OF C&I SYSTEM WORKS FOR 1X 500 MW
UNIT AT KORBA (WEST) TPS, CHATTISGARH.
TCN-01
DATED : 06/01/2012
TCN-02
DATED : 13/01/2012
TCN-03
DATED : 20/01/2012
|
|
(TENDER
NO : PSER:SCT:PDP-I1291:11
DATED : 15/12/2011)
ERECTION, TESTING, COMMISSIONING OF ENTIRE C&I WORKS GT, ST,
HRSG,UB ETC. FOR 366 MW CCPP AT PARADIP ,ORISSA.
TCN-01
DATED : 27/12/2011
TCN-02
DATED : 02/01/2012
|
|
(TENDER
NO : PSER:SCT:SDG-Q1290:11
DATED : 15/12/2011)
PROVIDING
FIELD QUALITY SERVICES FOR
2 X 500 MW SAGARDIGHI PROJECT.
TCN-01
DATED : 23/12/2011
|
|
(TENDER
NO : PSER:PUR:PMX:239(II):113
DATED : 13/12/2011)
SUPPLY
OF ORDINARY PORTLAND CEMENT –OPC- GR-43 AS PER IS-8112 TO BHEL
Site OFFICE, 2X250MW EXTENSION PROJECT,BARAUNI TPS, BEGUSARAI, BIHAR
– 851116, 1300MT PLUS AND MINUS 30 PERSENT.
|
|
(TENDER
NO : PSER:SCT:DPL-M1282:11
DATED : 09/12/2011)
DESIGN,
ENGINEERING, MANUFACTURING, SUPPLY-DELIVERY, ERECTION &
COMMISSIONING, TRIAL RUN, HANDING OVER TO CUSTOMER, ETC OF FIRE
PROTECTION SYSTEM FOR 1X250 MW UNIT AT DPL, DURGAPUR, WEST BENGAL.
TCN-01
DATED : 28/12/2011
TCN-02
DATED : 07/01/2012
TCN-03
DATED : 13/01/2012
TCN-04
DATED : 17/01/2012
|
|
(TENDER
NO : PSER:SCT:SDG-M1284
DATED : 12/12/2011)
DESIGN,
ENGINEERING, MANUFACTURING, SUPPLY/DELIVERY, ERECTION,
COMMISSIONING, TRIAL RUN, HANDING OVER TO CUSTOMER, ETC INCLUDING
O&M OF AIR CONDITIONING SYSTEM FOR 2X500 MW UNITS AT SAGARDIGHI
STPP, SAGARDIGHI, WEST BENGAL.
TCN-01
DATED : 24/12/2011
|
|
(TENDER
NO : PSER:SCT:DPL-M1283:11
DATED : 08/12/2011)
DESIGN,
ENGINEERING, MANUFACTURING, SUPPLY/DELIVERY, ERECTION,
COMMISSIONING, TRIAL RUN, HANDING OVER
TO CUSTOMER ETC OF
FUEL OIL UNLOADING
& STORAGE SYSTEM AND MISCELLANEOUS TANK SYSTEM (1 NO.
CONDENSATE STORAGE TANK) PACKAGE FOR
1X250 MW UNIT AT DPL, DURGAPUR, WB.
TCN-01
DATED : 27/12/2011
TCN-02
DATED : 07/01/2012
TCN-03
DATED : 16/01/2012
TCN-04
DATED : 17/01/2012
TCN-05
DATED : 20/01/2012
TCN-06
DATED : 21/01/2012
|
|
(TENDER
NO : PSER:SCT:SNG:C1285:11
DATED : 07/12/2011)
TOPOGRAPHICAL
SURVEY AND GEO-TECHNICAL INVESTIGATION OF 2 X 600 MW SINGARENI
THERMAL POWER PLANT AT ADILABAD, ANDHRA PRADESH.
TCN-01
DATED : 13/12/2011
TCN-02
DATED : 21/12/2011
|
|
(TENDER
NO : PSER:SCT:MRK-M1280:11
DATYED : 06/12/2011)
NIT FOR PROVIDING
COMPLETE LOGISTICS OF
VARIOUS TRANSPORTATIONS ETC
AND TRANSPORTATION
OF OVER DIMENSIONAL CONSIGNMENTS FROM VARIOUS BHEL MANUFACTURING
UNITS TO MONARCHAK SITE BY ROADWAYS & WATER WAYS THROUGH AREA OF
KARIMGANJ PORT/ BADAPUR GHAT FOR 100 MW TGBPP , NEEPCO , MONARCHAK,
SONAMURA , TRIPURA.
TCN-01
DATED : 09/12/2011
TCN-02
DATED : 20/12/2011
TCN-03
DATED : 23/12/2011
|
|
(TENDER
NO : PSER:SCT:MUZ-M1278
DATED :
05/12/2011)
DESIGN,
ENGINEERING, MANUFACTURING, SUPPLY, ERECTION, TESTING, COMMISSIONING
ETC INCLUDING O&M OF TG HALL EOT CRANE FOR 2X195 MW KBUNL,
MUZAFFARPUR TPS, BIHAR.
TCN-01
DATED : 14/12/2011
|
|
(TENDER
NO : PSER:PUR:PMX:193(XII):110
Dated 03/12/2011)
SUPPLY
OF PORTLAND SLAG CEMENT (PSC), AS PER IS 455-1989 AT 2X500 MW
KODERMA THERMAL POWER STATION OF DVC AT TILAIYA, UNIT-1 & 2,
DIST-KODERMA, JHARKHAND (5000 MT +/- 30%).
|
|
(TENDER
NO : PSER:SCT:BRM:M1279:11
DATED : 01/12/2011)
(I)PACKAGE-A:
MATERIAL HANDLING WORK OF BOILER & AUX, TG & AUX, ELECTRICAL
SYSTEM, C & I SYSTEM, NON-BHEL SYSTEM ETC,
PRESERVATION/CONSERVATION OF THE SAME AS DETAILED IN THE
TENDER FOR 2 X 250
MW BARAUNI EXTENSION PROJECT
, UNIT # 8 & 9 AT
BEGUSARAI, BIHAR. (II)PACKAGE-B: MATERIAL HANDLING WORK OF CEMENT
& STEEL AS DETAILED IN THE TENDER FOR 2 X 250 MW BARAUNI
EXTENSION PROJECT ,UNIT # 8 & 9 AT BEGUSARAI, BIHAR.
TCN-01
DATED : 21/12/2011
TCN-02
DATED : 26/12/2011
|
|
(TENDER
NO : PSER:SCT:VIZ-M1269:11
DATED :
01/12/2011)
NIT
FOR DESIGN, ENGINEERING, MANUFACTURING, SUPPLY, ERECTION,
COMMISSIONING ETC OF MILL REJECT SYSTEM FOR 2X520 MW UNITS AT HNPCL
VIZAG TPS, ANDHRA PRADESH.
TCN-01
DATED : 22/12/2011
|
|
(TENDER
NO : PSER:SCT:PDP-I1281:11
DATED : 01/12/2011)
NIT
FOR ERECTION, TESTING, COMMISSIONING OF ENTIRE C&I WORKS GT, ST,
HRSG,UB ETC. FOR 366 MW CCPP AT PARADIP ,ORISSA.
CANCELLED
|
|
(TENDER
NO : PSER:PUR:PMX:199(II):107
DATED : 28/11/2011)
SUPPLY
OF PORTLAND SLAG CEMENT (PSC) AS PER IS:455-1989 TO BHEL Site
OFFICE, AT 1X500 MW BOKARO TPS OF DVC, DIST- BOKARO, JHARKHAND
(4100MT +/-30%).
|
|
(TENDER
NO : PSER:PUR:PMX:199(II):106
DATED : 28/11/2011)
SUPPLY
OF ORDINARY PORTLAND CEMENT (OPC) GR-43 AS PER IS:8112
TO
BHEL Site OFFICE, AT
1X500 MW BOKARO TPS OF DVC, DIST- BOKARO, JHARKHAND (3900MT +/-30%).
|
|
(TENDER
NO : PSER:SCT:DPL-M1272:11 DATED : 21/11/2011)
NIT FOR DESIGN, ENGINEERING, MANUFACTURING, SUPPLY OF MATERIAL,
FABRICATION, INSPECTION, TESTING AT MANUFACTURE’S/SUB-VENDOR’S
WORKS, PAINTING, FORWARDING, DELIVERY, COMPLETE ERECTION &
COMMISSIONING OF AIR CONDITIONING SYSTEM FOR 1X250 MW UNIT AT DPL,
DURGAPUR, WEST BENGAL.
TCN-01
DATED : 07/12/2011
TCN-02
DATED : 14/12/2011
TCN-03
DATED : 16/12/2011
TCN-04
DATED : 20/12/2011
|
|
(TENDER
NO : PSER:SCT:VIZ-M1277:11
DATED : 21/11/2011)
NIT
FOR DESIGN, ENGINEERING,
MANUFACTURING, SUPPLY, ERECTION
& COMMISSIONING OF MISCELLANEOUS TANK PACKAGE FOR 2X520 MW
HNPCL, VIZAG THERMAL POWER PROJECT.
TCN-01
DATED : 09/12/2011
TCN-02
DATED : 16/12/2011
TCN-03
DATED : 20/12/2011
TCN-04
DATED : 27/12/2011
|
|
(TENDER
NO : PSER:SCT:
VIZ:M1267:11 DATED : 19/11/2011)
NIT
FOR DESIGN, ENGINEERING,
MANUFACTURING, SUPPLY, ERECTION,
COMMISSIONING AND HANDING OVER OF PASSENGER
ELEVATOR PACKAGE AT 2X520 MW HNPCL VIZAG THERMAL POWER
PROJECT.
TCN-01
DATED : 12/12/2011
TCN-02
DATED : 20/12/2011
|
|
(TENDER
NO : PSER:SCT:DPL:M1275:11 DATED : 19/11/2011)
NIT FOR DESIGN,
ENGINEERING, MANUFACTURING, SUPPLY /
DELIVERY, STORAGE & HANDLING, ERECTION,
COMMISSIONING, TRIAL RUN, HANDING OVER TO CUSTOMER ETC OF
VENTILATION SYSTEM FOR 1X250 MW UNIT AT DPL, DURGAPUR, WB.
TCN-01 DATED : 07/12/2011
TCN-02
DATED : 14/12/2011
TCN-03
DATED : 17/12/2011
TCN-04
DATED : 20/12/2011
|
|
(TENDER
NO : PSER:SCT:DPL-M1276:11 DATED : 18/11/2011)
NIT FOR DESIGN, ENGINEERING, MANUFACTURING, SUPPLY OF MATERIAL,
FABRICATION, INSPECTION, TESTING AT
MANUFACTURER’S/
SUB-VENDOR’S WORKS,
PAINTING, FORWARDING, DELIVERY,
COMPLETE ERECTION,
COMMISSIONING, TRIAL
RUN, HANDING OVER TO
CUSTOMER ETC OF ELEVATOR SYSTEM FOR 1X250 MW
EXTENSION UNIT NO. - 8 AT DPL, DURGAPUR, WEST BENGAL.
TCN-01
DATED : 09/12/2011
TCN-02
DATED : 12/12/2011
TCN-03
DATED : 21/12/2011
|
|
(TENDER
NO : PSER:
PUR: PMX: 233(II):104 DATED : 17/11/2011)
SUPPLY
OF PORTLAND SLAG CEMENT AS PER IS:455:1989 (PSC) TO BHEL Site
OFFICE, SAGARDIGHI, DIST:MURSHIDABAD, WEST BENGAL-742237 (10000MT
+/-30%).
TCN-01
DATED : 18/11/2011
TCN-02
DATED : 01/12/2011
|
|
(TENDER
NO : PSER:PUR:PMX:233(II):103
DATED : 17/11/2011)
SUPPLY
OF ORDINARY PORTLAND CEMENT (OPC) GR-43 AS PER IS:8112 TO BHEL Site
OFFICE, SAGARDIGHI, DIST:MURSHIDABAD, WEST BENGAL-742237 (6000MT
+/-30%).
TCN-01
DATED : 18/11/2011
TCN-02
DATED : 01/12/2011
|
|
(TENDER
NO : PSER:
PUR: PMX: 230(II):102 DATED : 17/11/2011)
SUPPLY
OF ORDINARY PORTLAND CEMENT (OPC) GR-43 AS PER IS:8112, AT 1X100 MW
GAS BASED POWER PLANT MONARCHAK CCP OF NEEPCO AT TRIPURA (3000MT
+/-30%).
TCN-01
DATED : 18/11/2011
|
|
(TENDER
NO : PSER:SCT:BRM-E1261:11
DATED : 15/11/2011)
NIT
FOR DESIGN, ENGINEERING, PROCUREMENT, SUPPLY, ERECTION,
COMMISSIONING, OPERATION AND
MAINTENANCE OF
CONSTRUCTION POWER
DISTRIBUTION SYSTEM AND
TEMPORARY ILLUMINATION SYSTEM FOR 2X250 MW, UNIT # 8 & 9
BARAUNI TPP,BIHAR.
TCN-01
DATED : 16/11/2011
TCN-02
DATED : 19/11/2011
TCN-03
DATED : 06/12/2011
TCN-04
DATED : 09/12/2011
TCN-05
DATED : 13/12/2011
TCN-06
DATED : 16/12/2011
|
|
(TENDER
NO : PSER:SCT:
BRM-M1266 DATED : 14/11/2011)
NIT
FOR DESIGN, ENGINEERING, MANUFACTURING, SUPPLY, TESTING,
COMMISSIONING ETC
OF TG HALL EOT CRANE FOR 2X250 MW BARAUNI EXTENSION PROJECT
UNIT # 8 & 9 AT BEGUSARAI, BIHAR.
TCN-01
DATED : 05/12/2011
TCN-02
DATED : 19/12/2011
TCN-03
DATED : 05/01/2012
TCN-04
DATED : 25/01/2012
|
|
(TENDER
NO : PSER:PUR:PMX:189(IX):097
DATED : 08/10/2011)
NIT
FOR 30M HIGH MAST LIGHTING SYSTEM (10 NOS.) WITH ACCESSORIES FOR
BHEL:PSER’S:BARAUNI SITE.
|
|
(TENDER NO : PSER:SCT:SDG:C1274:11 DATED : 05/11/2011)
(I) PACKAGE-C: CIVIL,
STRUCTURAL, ARCHITECTURAL ETC
OF CIVIL SUPERSTRUCTURE WORK
OF 1X 500 MW UNIT
# 3 FOR 2X500
MW UNITS AT
SAGARDIGHI STPP, WB.
(II) PACKAGE-D: CIVIL,STRUCTURAL,ARCHITECTURAL ETC OF CIVIL SUPERSTRUCTURE
WORK OF 1X500 MW UNIT # 4 FOR 2X500 MW UNITS AT SAGARDIGHI STPP, WB.
TCN-01
DATED : 19/11/2011
TCN-02
DATED : 25/11/2011
TCN-03
DATED : 30/11/2011
TCN-04
DATED : 02/12/2011
|
|
(TENDER NO : PSER:SCT:BRM-C1273:11 DATED : 05/11/2011)
(I)PKG-A: CIVIL, STRUCTURAL AND
ARCHITECTURAL WORKS INCLUDING PILING AND
GROUND IMPROVEMENT ETC OF 1X250 MW UNIT # 8 FOR 2X 250MW UNITS AT BARAUNI
TPP,BEGUSARAI, BIHAR. (II)PKG-B: CIVIL,
STRUCTURAL AND ARCHITECTURAL WORKS
INCLUDING PILING AND GROUND IMPROVEMENT ETC OF 1X250 MW UNIT # 9 FOR 2X 250MW UNITS AT BARAUNI
TPP,BEGUSARAI, BIHAR.
TCN-01
DATED : 15/11/2011
TCN-02
DATED : 22/11/2011
TCN-03
DATED : 23/11/2011
TCN-04
DATED : 25/11/2011
TCN-05
DATED : 28/11/2011
TCN-06
DATED : 30/11/2011
TCN-07
DATED : 02/12/2011
|
|
(TENDER
NO : PSER:SCT:PDP-F1271:
2581
DATED : 04/11/2011)
NIT
FOR
HIRING OF 1 NO 40 MT TYRE MOUNTED ROUGH TERRAIN
CRANE FOR IOCL-PARADIP PROJECT AS PER SPECIFICATION.
TCN-01
DATED : 09/11/2011
|
|
(TENDER NO :
PSER:SCT:ABJ-F1270: 2575 DATED :
01/11/2011)
NIT FOR HIRING OF 1 (ONE)
NO. MID RANGE HEAVY LIFT CRAWLER
CRANE FOR 4X270 MW AINL ABHJEET TPS, PHASE – I & II.
TCN-01
DATED : 21/11/2011
|
|
(TENDER
NO : PSER:SCT: SDG-M1268 DATED : 31/10/2011)
NIT FOR DESIGN, ENGINEERING, MANUFACTURING,
SUPPLY, ERECTION, TESTING, COMMISSIONING ETC
INCLUDING O&M OF TWO NOS. 110/25 TONNE CAPACITY DIOUBLE GIRDER
TG HALL EOT CRANE FOR 2X500 MW UNITS AT SAGARDIGHI STPP, SAGARDIGHI,
WEST BENGAL.
TCN-01
DATED : 10/11/2011
TCN-01
DATED : 21/11/2011
|
|
(TENDER
NO : PSER:SCT:HLD-B1259:11
DATED : 31/10/2011)
NIT FOR TRANSPORTATION OF MATERIALS , STORAGE AS REQUIRED , ERECTION
, GRID BLASTING OF PIPES, INSULATION ,
COMMISSIONING , TRIAL RUN , PG TEST , FINAL
PAINTING AND HANDING OVER ETC OF BOILER , ROTATING MACHINES ,
DUCT , ESP , CRITICAL PIPING , MISC PIPING ETC. OF 3X150 MW
UNITS AT IPCL HALDIA TPP , WB.
TCN-01
DATED : 19/11/2011
TCN-02
DATED : 05/12/2011
TCN-03
DATED : 12/12/2011
TCN-04
DATED : 19/12/2011
TCN-05
DATED : 26/12/2011
TCN-06
DATED : 05/01/2012
TCN-07
DATED : 11/01/2012
TCN-08
DATED : 16/01/2012
TCN-09
DATED : 25/01/2012
TCN-10
DATED : 01/02/2012
|
|
(TENDER
NO : PSER:SCT:DPL-M1264:11 DATED : 31/10/2011)
NIT FOR DESIGN, ENGINEERING, MANUFACTURING, SUPPLY OF MATERIAL,
FABRICATION, INSPECTION, TESTING AT
MANUFACTURER’S /
SUB-VENDOR’S WORKS,
PAINTING, FORWARDING, DELIVERY,
COMPLETE ERECTION AND COMMISSIONING OF COMPRESSED AIR SYSTEM FOR
1X250 MW EXTENSION UNIT NO. - 8 AT DPL, DURGAPUR, WEST BENGAL
TCN-01
DATED : 21/11/2011
TCN-02
DATED : 25/11/2011
|
|
(TENDER
NO : PSER:SCT:MRW-E1265:11 DATED : 25/10/2011)
NIT FOR ERECTION, TESTING, COMMISSIONING ETC OF GT, ST, UAT, MISC
TRANSFORMERS, BUS-DUCT, HT/ LT SWGR/ PANELS,
MISC PANELS, CABLING WORK
ETC FOR 2X500 MW UNITS AT MARWA TPP, CHATTISGARH.
TCN-01
DATED : 27/10/2011
TCN-02
DATED : 11/11/2011
TCN-03
DATED : 16/11/2011
TCN-04
DATED : 22/11/2011
|
|
(TENDER
NO : PSER:
PUR:TSX:110:089
DATED : 18/10/2011)
NIT
FOR SUPPLY OF ONE (01) NO. “PORTABLE FLUE GAS ANALYSER”
FOR TSX DEPARTMENT : BHEL:PSER:KOLKATA.
TCN-01
DATED : 01/11/2011
|
|
(TENDER
NO : PSER: PUR:TSX:108:090
DATED : 18/10/2011)
NIT
FOR SUPPLY ETC. OF ONE (01) NO. “PORTABLE OXYGEN ANALYSER” FOR
TSX DEPARTMENT : BHEL:PSER:KOLKATA.
TCN-01
DATED : 02/11/2011
|
|
(TENDER
NO : PSER:
PUR:TSX:061(IV):088
DATED : 18/10/2011)
NIT
FOR SUPPLY ETC. OF FOUR (04)
NOS. “DIGITAL SOUND / NOISE LEVEL
METER” FOR TSX DEPARTMENT : BHEL:PSER:KOLKATA.
TCN-01
DATED : 22/10/2011
TCN-02
DATED : 31/10/2011
|
|
(TENDER
NO : PSER:
PUR:TSX:060(IV):091 DATED : 18/10/2011)
NIT FOR SUPPLY OF EIGHT (08) NOS. DIGITAL VIBRATION METER AS PER TENDERED SPECIFICATION ALONG
WITH CALIBRATION CERTIFICATE FROM
GOVT OF INDIA AGENCY (ERTL/NTH ETC) ONLY . INSPECTION OF THE EQUIPMENT AT BHEL OFFICE & DEMONSTRATION OF THE SUPPLIED EQUIPMENT TO BHEL’S ENGINEER.
TCN-01
DATED : 31/10/2011
|
|
TENDER
NO : PSER:SCT:RWD-M1262:11 DATED :
14-10-2011)
NIT FOR DESIGN, FABRICATION, MANUFACTURING, TESTING, TRANSPORTATION
FROM VENDOR’S WORKS TO PORT OF DESPATCH
IN INDIA, UNLOADING AND HANDLING AT SITE, STORAGE AND
PRESERVATION, ISSUE AND
LOCAL TRANSPORTATION AT
SITE, ERECTION, TESTING AND
COMMISSIONING OF GATES AND PENSTOCK (HM PACKAGE MATERIAL) AT
2X14 MW NYABORONGO HEP AT REPUBLIC OF RWANDA, AFRICA.
TCN-01
DATED : 27/10/2011
TCN-02
DATED : 03/11/2011
TCN-03
DATED : 10/11/2011
TCN-04
DATED : 14/11/2011
TCN-05
DATED : 16/11/2011
TCN-06
DATED : 21/11/2011
|
|
(TENDER
NO : PSER:SCT:LPT-E1254:11
DATED : 14/10/2011)
NIT
FOR ERECTION, COMMISSIONING ETC OF ELECTRICAL SYSTEM & PLANT
ILLUMINATION SYSTEM FOR 53 MW COMBINED CYCLE POWER PLANT AT
LEPETKATA, BCPL, ASSAM.
TCN-01
DATED : 02/11/2011
TCN-02
DATED : 08/11/2011
TCN-03
DATED : 09/11/2011
TCN-04
DATED : 01/12/2011
TCN-05
DATED : 06/12/2011
TCN-06
DATED : 19/12/2011
|
|
(TENDER
NO : PSER:SCT:PAL-I1263:11 DATED : 13/10/2011)
NIT FOR ERECTION, TESTING, COMMISSIONING ETC OF COMPLETE C&I
SYSTEM INCLUDING ALL MAX SYSTEM & PANELS , MMI SYSTEM FOR GT,
STATIC STARTING SYSTEM OF GT, STG, HRSG AND STATION C&I,
CONTROLS AND C&I OF BALANCE SYSTEM/ITEM FOR 2X363.3 MW UNITS AT
PALATANA, TRIPURA.
TCN-01
DATED : 25/10/2011
TCN-02
DATED : 28/10/2011
TCN-03
DATED : 02/11/2011
TCN-04
DATED : 08/11/2011
TCN-05
DATED : 01/12/2011
|
|
(TENDER
NO : PSER:PUR:PMX:222(V):086
DATED : 11/10/2011)
SUPPLY
OF ORDINARY PORTLAND CEMENT (OPC) GR-43 AS PER IS:8112, TO 1x53 MW
CAPTIVE POWER PLANT OF M/S BRAHMAPUTRA CRACKER & POLYMER LIMITED
AT LEPETKATA, DIBRUGARH , ASSAM (1500MT +/-30%).
|
|
(TENDER
NO : PSER:
PUR: KDNG-S052:11 DATED : 10/10/2011)
NIT
FOR REBUILDING OF GENERATOR STATOR (01 NO.) AT SERVICE BAY OF
KHANDONG PH OF KHEP FOR 1X25 MW, UNIT-1 AT KHANDONG HEP,
NEEPCO, ASSAM.
TCN-01
DATED : 31/10/2011
TCN-02
DATED : 09/11/2011
|
|
(TENDER
NO :
PSER:SCT:MIS-Q1258:11
DATED : 01/10/2011)
NIT
FOR
PROVIDING FIELD QUALITY SERVICES IN VARIOUS FIELD FOR 366 MW GAS
BASED CCPP AT PARADIP, ORISSA, 2X250
MW BARAUNI EXTENSION TPS, 2X195 MW MUZAFFARPUR TPS, 3X150 MW IPCL
HALDIA, 100 MW CCPP, MONARCHAK, TRIPURA PROJECT , 2 X 500 MW
SAGARDIGHI PROJECT.
|
|
(TENDER
NO : PSER:SCT:PDP-E1260:11
DATED : 01/10/2011)
NIT
FOR ERECTION, TESTING, COMMISSIONING ETC. OF ENTIRE ELECTRICAL WORKS
FOR GT , ST, UAT , MISC. TRANSFORMERS , BUS DUCT ,
HT/LT
SWGR/PANELS , MISC. PANELS, CABLING WORK ETC. FOR
366 MW (CCPP) IOCL
PARADIP REFINERY PROJECT.
TCN-01
DATED : 15/10/2011
TCN-02
DATED : 18/10/2011
|
|
(TENDER
NO : PSER:PUR:PMX:239(I):082
DATED : 30/09/2011)
NIT
FOR SUPPLY OF ORDINARY PORTLAND CEMENT (OPC) GR-43 AS PER IS:8112 TO
BHEL Site OFFICE, 2X250MW EXTENSION PROJECT,BARAUNI TPS, BEGUSARAI,
BIHAR – 851116, (1300MT +/-30%).
TCN-01
DATED : 15/10/2011
|
|
(TENDER
NO : PSER:SCT:PSC-C1249:11 DATED : 22/09/2011)
NIT FOR CONSTRUCTION OF THREE NOS.
REMOVABLE / RE-ERECTABLE TYPE PRE-ENGINEERED,
PRE-FABRICATED STEEL CLOSED STORAGE SHEDS AND CONSTRUCTION OF
SECURITY FENCING OF THE ENTIRE STORAGE AREA AT 6X200 MW
PUNATSANGCHHU-I HEP SITE, BHUTAN.
TCN-01
DATED : 30/09/2011
TCN-02
DATED : 13/10/2011
TCN-03
DATED : 17/10/2011
|
|
(TENDER
NO : PSER:SCT: KBA-F1257: 2531 DATED : 20/09/2011)
NIT FOR HIRING OF 1 NO. 150 MT CLASS HEAVY LIFT CRAWLER CRANE FOR
1X500 MW KORBA (WEST) TPS, CHATTISGARH.
|
|
(TENDER
NO : PSER:SCT:DPL:F1256:11 DATED : 19/09/2011)
NIT FOR HIRING OF ONE (1) NO. TOWER CRANE FOR 1 X 250 MW DPL UNIT
#8, DURGAPUR, WEST BENGAL.
TCN-01
DATED : 01/10/2011
TCN-02 DATED :
11/10/2011
TCN-03 DATED :
18/10/2011
|
|
(TENDER
NO : PSER:
PUR:PMX:128(V):077 DATED : 19/09/2011)
NIT FOR SUPPLY OF PAINT FOR FINISH PAINTING (AS PER TENDERED
SPECIFICATION) OF 2X500 MW KAHALGAON STPP, STAGE-II PHASE-I UNIT-5
& 6, KAHALGAON, DIST-BHAGALPUR, BIHAR.
|
|
(TENDER
NO : PPSER:SCT:PDP-T1255:11 DATED : 17/09/2011)
NIT FOR ERECTION, TESTING & COMMISSIONING OF 3
NOS OF FR. 9 GTG, 2 NOS OF
30 MW STG, ASSOCIATED BOPS , 2 NOS OF DE-AERATORS , 8
NOS OF BFPS AND RELATED IBR & NON IBR PIPING AT 366
MW COMBINED CYCLE POWER PROJECT , PARADIP REFINERY PROJECT , ORISSA.
TCN-01
DATED : 27/09/2011
TCN-02
DATED : 01/10/2011
|
|
( TENDER NO :
PSER:SCT:SAL:M1241:11 DATED : 14/09/2011 )
NIT FOR DESIGN, ENGINEERING, MANUFACTURING,
SUPPLY & INSTALLATION OF MILL REJECT HANDLING SYSTEM FOR 3 X 250 MW NTPC
BONGAIGAON THERMAL POWER PROJECT,KOKRAJHAR, ASSAM.
TCN-01
DATED : 10/10/2011
|
|
TENDER
NO : PSER:PUR:PMX:225(III):075
DATED : 14/09/2011)
SUPPLY OF ORDINARY PORTLAND CEMENT (OPC) GR-43 AS PER IS:8112, TO
1040MW VIZAG PROJEC, HINDUJA NATIONAL POWER CORP. LTD. ,
PALAVALASA, VISAKHAPATNAM (30000MT +/-30%).
TCN-01
DATED : 24/09/2011
|
|
(TENDER
NO : PSER:SCT: DPL-F1251: 2515 DATED : 12/09/2011)
NIT FOR HIRING OF 1 NO. 150 MT CLASS HEAVY LIFT CRAWLER CRANE FOR
1X250 MW DURGAPUR PROJECTS LTD, DURGAPUR, WB.
TCN-01
DATED : 14/09/2011
|
|
(TENDER
NO : PSER:SCT:PDP:F1248:11 DATED :
09/09/2011)
NIT FOR HIRING OF ONE (1) NO. 150 MT HEAVY LIFT CRAWLER CRANE FOR
366 MW IOCL-PARADIP REFINERY PROJECT, CPP, ORISSA.
|
|
(TENDER
NO : PSER:SCT:KBA-E1250:2514 DATED :
09/09/2011)
NIT
FOR
ERECTION, TESTING, COMMISSIONING ETC OF GT, ST, UAT, MISC
TRANSFORMER, BUS-DUCT, HT/ LT SWGR / PANELS, MISC
PANELS, CABLING ETC FOR 1X500 MW
UNIT AT KORBA (WEST) TPS, CHATTISGARH.
TCN-01
DATED : 28/09/2011
|
|
(TENDER
NO : PSER: PUR:TSX:073(II):071
DATED : 06/09/2011)
SUPPLY
ETC. OF THREE (03)
NOS. OIL FILTRATION
UNIT FOR BHEL:PSER:PSER’S SITES
(IISCO-BURNPUR, KODERMA AND MARWA SITE – ONE OIL
FILTRATION UNIT FOR EACH SITE) .
|
|
(TENDER
NO : PSER: PUR:TSX:072(II):069
DATED : 06/09/2011)
SUPPLY ETC OF THREE (03) NOS. LOW VACCUM
DEHYDRATION UNIT AT BHEL: SITES (KODERMA, IISCO- BURNPUR &
MARWA)
|
|
(TENDER
NO : PSER:
PUR:TSX:101(II):070
DATED :
06/09/2011)
SUPPLY ETC OF
THREE (03) NOS. “FIRE
RESISTANT FLUIDS (FRF) FILTRATION TROLLOY”
AT BHEL:SITES (MARWA, KODERMA & MAITHON)
TCN-01
DATED : 19/09/2011
|
|
(TENDER
NO : PSER:
PUR:TSX:036(IV):064
DATED : 03/09/2011)
NIT FOR SUPPLY ETC. OF
EIGHT (08) NOS. “DIGITAL TONG TESTER” FOR TSX DEPARTMENT:
BHEL:PSER:KOLKATA
TCN-01
DATED : 09/09/2011
|
|
(TENDER
NO : PSER: PUR:TSX:066(V):065
DATED : 03/09/2011)
NIT FOR SUPPLY ETC. OF FOUR (04) NOS. “NON-CONTACT TYPE THERMOMETER” FOR TSX DEPARTMENT:
BHEL:PSER:KOLKATA
TCN-01
DATED : 09/09/2011
|
|
(TENDER
NO : PSER: PUR:TSX:079(II):066
DATED : 03/09/2011)
NIT FOR SUPPLY ETC. OF
FOUR (04) NOS. “mV-mA CALIBRATOR” FOR TSX DEPARTMENT:
BHEL:PSER:KOLKATA
TCN-01
DATED : 09/09/2011
|
|
(TENDER
NO : PSER: PUR:TSX:031(VI):067
DATED : 03/09/2011)
NIT FOR SUPPLY ETC. OF
SIX (06) NOS. “DIGITAL INSULATION TESTER (5KV)” FOR TSX
DEPARTMENT: BHEL:PSER:KOLKATA
TCN-01
DATED : 09/09/2011
|
|
(TENDER
NO : PSER: PUR:TSX:031(V):068
DATED : 03/09/2011)
NIT FOR SUPPLY ETC. OF
ONE (01) NO. “DIGITAL INSULATION TESTER (10KV)” FOR TSX
DEPARTMENT: BHEL:PSER:KOLKATA
TCN-01
DATED : 09/09/2011
|
|
(TENDER
NO : PSER:
PUR:TSX:106:060
DATED : 03/09/2011)
NIT FOR SUPPLY ETC. OF TWO (02) NO. “PORTABLE
HAND HELD DIGITAL LUX METER” FOR
TSX DEPARTMENT : BHEL:PSER:KOLKATA
TCN-01
DATED : 09/09/2011
|
|
(TENDER
NO : PSER:
PUR:TSX:058(III):059
DATED : 03/09/2011)
NIT FOR SUPPLY ETC. OF SIX -06- NUMBERS
“DIGITAL mA TONG TESTER”” FOR TSX DEPARTMENT :
BHEL:PSER:KOLKATA
TCN-01
DATED : 09/09/2011
|
|
(TENDER
NO : PSER:
PUR:TSX:034(IV):063 DATED : 03/09/2011)
NIT
FOR SUPPLY ETC. OF EIGHT
NOS. “DIGITAL MULTIMETER (THREE & HALF DIGIT)” FOR
TSX DEPARTMENT : BHEL:PSER:KOLKATA.
TCN-01
DATED : 09/09/2011
|
|
(TENDER
NO : PSER:
PUR:TSX:107:061 DATED : 03/09/2011)
NIT FOR SUPPLY ETC. OF SUPPLY ETC OF FOUR
(04) NOS. “DIGITAL OSCILLOSCOPE” FOR TSX DEPARTMENT :
BHEL:PSER:KOLKATA
TCN-01
DATED : 09/09/2011
|
|
(TENDER
NO : PSER:
PUR:TSX:059(IV):062 DATED : 03/09/2011)
NIT
FOR SUPPLY ETC. OF EIGHT (08) NOS. “NON CONTACT
TACHOMETER” FOR TSX DEPARTMENT : BHEL:PSER:KOLKATA.
TCN-01
DATED : 09/09/2011
|
|
( TENDER NO :
PSER:SCT:SAL-T1243:11 DATED : 30/08/2011 )
NIT FOR ERECTION, TESTING, COMMISSIONING ETC OF STEAM TURBINE &
AUXILIARIES, GENERATOR & AUXILIARIES, PUMPS, PIPING, MISC
EQUIPMENTS ETC FOR 1X250 MW, UNIT #1 AT NTPC, BONGAIGAON TPP,
SALAKATI, DIST-KOKRAJHAR (BATD), ASSAM.
TCN-01
DATED : 20/09/2011
TCN-02
DATED : 22/09/2011
|
|
TENDER
NO : PSER:PUR:PMX:237:058
DATED : 30/08/2011)
NIT FOR SUPPLY AND INSTALLATION OF 10 NOS .PRE-FABRICATED BUNK HOUSE AT
BHEL: PSER: MONARCHAK PROJECT SITE.
TCN-01
DATED : 12/09/2011
|
|
(TENDER
NO : PSER:PUR:PMX:205(VII):057
DATED : 25/08/2011)
TENDER DOCUMENT FOR SUPPLY OF ORDINARY PORTLAND CEMENT (OPC) GR-43
AS PER IS:8112, TO 1X500 MW KORBA WEST THERMAL POWER STATION OF
CSPGCL AT CHHATTISGARH (4000MT +/-30%).
TCN-01
DATED : 08/09/2011
|
|
(TENDER
NO : PSER:SCT:SDG-M1246:11 DATED : 23/08/2011)
NIT FOR MATERIAL MANAGEMENT/HAANDLING WORK OF BOILER &
AUXILIARIES , TG & AUXILIARIES; ELECTRICAL SYSTEM
, C & I SYSTEM , NON BHEL SYSTEM
, CEMENT , STEEL ETC. FOR 2X500
MW SAGARDIGHI POWER PROJECT , PHASE-II , UNIT 3 & 4 , WEST
BENGALTCN-01
DATED : 02/09/2011
TCN-02
DATED : 03/09/2011
|
|
(TENDER
NO : PSER:SCT:VIZ-Q1245:11
DATED : 23/09/2011)
NIT
FOR PROVIDING SERVICES OF FIELD QUALITY ASSURANCE FOR DIFFERENT
WORKING AREAS AS PER SCOPE DETAILED IN TENDER DOCUMENT FOR
UNIT-1&2 OF 2X520 MW HNPCL, VIZAG TPP, AP.
|
|
(TENDER NO: PSER-SCT-MIS-M1244-MM LOGISTICS DATED:19/08/2011)
EXPRESSION OF INTEREST (
Logistics/ support service for material handling work at various
project sites of BHEL, PSER).
tcn-01
dated : 26/08/2011
tcn-02
dated : 05/09/2011
|
|
(TENDER
NO : PSER:SCT:
BAR-B1227:11 DATED : 19/08/2011)
NIT FOR PROVIDING COMPLETE
SUPPLY OF 2 NOS. OF PORTABLE AUXILIARY
BOILER AT SITE & INSTALLATION
(PRE-ASSEMBLY, ERECTION,
ALIGNMENT, WELDING ETC.),
COMMISSIONING & OPERATION OF
PORTABLE AUXILIARY BOILER
OF MINIMUM CAPACITY – 20T/HR
@ 340˚C AT PRESSURE - 17 KG/CM² OPERATING ON LDO AT BARH
STG-II SITE, BIHAR INCLUDING ALL MANPOWER, FUEL & CONSUMABLES
ETC. AS ENUMERATED IN DETAIL IN THE TENDER SPECIFICATION ON HIRING
BASIS.
tcn-01
dated : 29/08/2011
tcn-02
dated : 08/09/2011
tcn-03
dated : 10/10/2011
tcn-04
dated : 21/10/2011
tcn-05
dated : 31/10/2011
tcn-06
dated : 15/11/2011
tcn-07
dated : 30/11/2011
tcn-08
dated : 15/12/2011
tcn-09
dated : 26/12/2011
tcn-10
dated : 10/01/2012
tcn-11
dated : 11/01/2012
tcn-12
dated : 20/01/2012
|
|
(TENDER
NO : PSER:SCT:PDP-T1242:11 DATED : 18/08/2011)
NIT FOR ERECTION, TESTING &
COMMISSIONING OF 3
NOS OF FR. 9 GTG ,
2
NOS
OF
30
MW STG , ASSOCIATED BOPS , 2 NOS
OF DE-AERATORS , 8 NOS
OF BFPS AND RELATED IBR & NON
IBR PIPING AT 366 MW COMBINED CYCLE POWER PROJECT , PARADIP
REFINERY PROJECT , ORISSA .
tcn-01
dated : 26/08/2011
CANCELLED
|
|
(TENDER
NO : PSER:
PUR:MSX:175(V):056 DATED : 18/08/2011)
SUPPLY
& INSTALLATION TWELEVE (12) NO. MULTIMEDIA PROJECTOR
for VARIOUS BHEL:PSER SITES.
tcn-01
dated : 31/08/2011
|
|
(TENDER
NO : PSER:SCT:VIZ-M1235:11
DATED : 09/08/2011)
NIT
FOR DESIGN, ENGINEERING, MANUFACTURING, TESTING, TRANSPORTATION TO
SITE, RECEIPT, UNLOADING, STORAGE, ERECTION,
TESTING, COMMISSIONING, HANDING OVER ETC OF FUEL OIL SYSTEM
PACKAGE FOR 2X520 MW UNITS AT HNPCL VIZAG TPS, ANDHRA PRADESH.
tcn-01
dated :23/08/2011
TCN-02 DATED
:24/08/2011
TCN-03 DATED :06/09/2011
TCN-04 DATED :16/09/2011
|
|
(TENDER
NO : PSER:SCT:VIZ-M1232:11
DATED : 09/08/2011)
NIT
FOR DESIGN, ENGINEERING, MANUFACTURING, SUPPLY, ERECTION,
COMMISSIONING ETC OF AIR CONDITIONING SYSTEM FOR 2X520 MW UNITS AT
HNPCL VIZAG TPS, ANDHRA PRADESH.
tcn-01
dated :23/08/2011
tcn-02
dated :25/08/2011
tcn-03
dated :06/09/2011
tcn-04
dated :08/09/2011
tcn-05
dated :17/09/2011
|
|
(TENDER
NO : PSER:SCT:VIZ-M1231:11
DATED : 09/08/2011)
NIT
FOR
DESIGN, ENGINEERING,
MANUFACTURING, SUPPLY, ERECTION,
COMMISSIONING ETC OF FIRE PROTECTION SYSTEM FOR 2X520 MW UNITS AT
HNPCL VIZAG TPS, ANDHRA PRADESH.
tcn-01
dated :16/08/2011
tcn-02
dated :20/08/2011
tcn-03
dated :23/08/2011
tcn-04
dated :24/08/2011
tcn-05
dated :03/09/2011
tcn-06
dated :09/09/2011
tcn-07
dated :13/09/2011
tcn-08
dated :15/09/2011
tcn-09
dated :17/09/2011
|
|
(TENDER
NO : PSER:SCT:
MUZ-M1237 DATED : 09/08/2011)
NIT
FOR DESIGN, ENGINEERING, MANUFACTURING, SUPPLY,
ERECTION, TESTING, COMMISSIONING ETC OF TG HALL EOT CRANE FOR
2X195 MW KBUNL, MUZAFFARPUR TPS, BIHAR.
TCN-01
DATED : 23/08/2011
TCN-02
DATED : 29/08/2011
TCN-03
DATED : 02/09/2011
TCN-04
DATED : 06/09/2011
TCN-05
DATED : 19/09/2011
TCN-05
DATED : 14/11/2011
CANCELLED
|
|
(TENDER
NO : PSER:SCT:muz-S1234:11 DATED : 03/08/2011)
NIT FOR DISMANTLING OF EXISTING C&I SYSTEM, AND ERECTION,
TESTING, COMMISSIONING ETC OF NEW CONTROL
& INSTRUMENTATION ( C & I )
SYSTEM FOR 1 X 110 MW UNIT # 1 AT MUZAFFARPUR TPS,KBUNL,
BIHAR.
TCN-01
DATED : 19/08/2011
TCN-02
DATED : 24/08/2011
|
|
(TENDER
NO : PSER:PUR:SAS:057:053 DATED : 02/08/2011)
NIT FOR SUPPLY,
COMMISSIONING & TRAINING OF
ONE (01) NO. “FOUR(04) CHANNEL VIBRATION ANALYSER “
FOR SAS DEPARTMENT : BHEL:PSER:KOLKATA.
tcn-01
dated :05/08/2011
tcn-02
dated :12/08/2011
|
|
(TENDER
NO : PSER:SCT:BRM:C1236:11
DATED : 29/07/2011)
NIT FOR CONSTRUCTION OF TEMPORARY
FENCING WITH CGI SHEET, CEMENT
GO-DOWN, GUEST HOUSE, UP-GRADATION OF FIELD HOSTEL,
PERMANENT BOUNDARY WALL, APPROACH ROAD, FILLING AND
COMPACTION OF ENTIRE PLOT AREA ETC FOR 2 X 250 MW
BARAUNI THERMAL POWER STATION (EXTENSION
PROJECT), PHASE-II, BIHAR AND
CIVIL WORKS FOR BOILER AUXILIARIES FOUNDATION FOR R & M
JOB OF 2 X 110 MW BARAUNI THERMAL POWER STATION, PHASE-I,BIHAR.
tcn-01
dated :08/08/2011
|
|
(TENDER
NO : PSER:SCT:PDP:F1230:11 DATED : 22/07/2011)
NIT FOR HIRING OF ONE (1) NO. 150 MT HEAVY LIFT CRAWLER CRANE FOR 366
MW (3XFR-9E GTG, 3X220 TPH HRSG, 4X300 TPH UB, 2X30 MW STG AND THEIR
AUXILIARIES), IOCL-PARADIP
REFINERY PROJECT, CPP, ORISSA.
tcn-01
dated :03/08/2011
CANCELLED
|
|
(TENDER
NO : PSER:SCT:BRM-S1224:11 DATED : 19/11/2011)
NIT FOR R & M OF
BOILER & AUX, TURBINE, TG SET & AUX, MISCELLANEOUS
EQUIPMENT FOR 1X110 MW UNIT # 7 AT BARAUNI TPS, BSEB, BIHAR.
TCN-01
DATED : 27/07/2011
TCN-02
DATED : 09/08/2011
|
|
(TENDER
NO : PSER:SCT:BAR-M1223:11
DATED : 11/07/2011)
NIT FOR PROVIDING
COMPLETE LOGISTICS
OF VARIOUS
TRANSPORTATIONS ETC
AND TRANSPORTATION INCLUDING
CUSTOM CLEARANCE OF ALL IMPORTED CARGOES
FROM PORT OF ORIGIN AT HALDIA /
KOLKATA PORT TO BARH SITE
FOR 2 X 660 MW NTPC BARH STPS STAGE
– II PROJECT BARH, PATNA, BIHAR.
|
|
(TENDER
NO : PSER:PUR:PMX:203(II):045
DATED : 06/07/2011)
NIT FOR SUPPLY OF PPC CEMENT
IS 1489 PART - 1 1991 ( FLYASH BASED )
– 1500 MT +/- 30% FOR PALATANA
PROJECT OF BHEL.
|
|
(TENDER
NO : PSER:PUR:PMX:203(II):044
DATED : 06/07/2011)
NIT FOR SUPPLY
OF OPC GR - 43 AS PER IS:8112 – 3500 MT +/- 30% FOR PALATANA
PROJECT OF BHEL.
|
|
(TENDER
NO : PSER:PUR:MSX:214:042 DATED : 05/07/2011)
NIT FOR SETTING UP TELEMEDICINE SYSTEM
BETWEEN CORPORATE MEDICAL GROUP, NEW DELHI & PALATONA,
BONGAIGAON, JHAJJAR & SATPURA SITES.
TCN-01
DATED : 08/07/2011
TCN-02
DATED : 18/07/2011
TCN-03
DATED : 26/07/2011
TCN-04
DATED : 10/08/2011
|
|
(TENDER
NO : PSER:PUR:PMX:096(IX):040 DATED : 05/07/2011)
NIT FOR DESIGN, MANUFACTURING, TESTING AND SUPPLY OF TWO
NOS. 33
KV/ 11 K V, 3.15 MVA POWER TRANSFORMER AT BHEL:PSER’S
BARAUNI SITE
TCN-01
DATED : 15/07/2011
|
|
(TENDER
NO : PSER:PUR:PMX:149(XI):041 DATED : 05/07/2011)
NIT
FOR SUPPLY OF (I) 05 (FIVE) NOS. LT-KIOSK 415V 800 WITH
ACCESSORIES & (II) 03 (THREE) NOS. LT -KIOSK 415V 400 WITH
ACCESSORIES AT BHEL:SAGARDIGHI SITE
|
|
(TENDER
NO : PSER:PUR:PMX:096(VIII):039 DATED : 05/07/2011)
NIT FOR DESIGN, MANUFACTURING, TESTING AND SUPPLY
OF SIX
NOS. 11
KV/433 V, 500 KVA ONAN OIL FILLED TRANSFORMER AT BHEL:PSER’S
SAGARDIGHI SITE.
TCN-01
DATED : 15/07/2011
|
|
(TENDER
NO : PSER:PUR:PMX:233(I):037 DATED : 01/07/2011)
NIT FOR TENDER DOCUMENT FOR SUPPLY OF PORTLAND SLAG CEMENT (
PSC ) AS PER IS :455-1989 TO BHEL Site OFFICE, SAGARDIGHI,
DIST:MURSHIDABAD, WEST BENGAL-742237 (12100MT +/-30%).
|
|
(TENDER
NO : PSER:SCT:MIS:F1211:11 DATED : 30/06/2011)
NIT FOR ANNUAL RATE CONTRACT FOR PROVIDING
SERVICES FOR REGULAR OPERATION & ROUTINE
MAINTENANCE,
BREAKDOWN REPAIRS,
DISMANTLING, LOADING
SUPERVISION, UNLOADING
SUPERVISION, ASSEMBLY,
LOAD TEST
OF CRANES
AT VARIOUS
BHEL PROJECT SITES.
|
|
(TENDER
NO : PSER:SCT:BRM:C1220:11
DATED : 28/06/2011)
NIT FOR SITE CLEARANCE, TEMPORARY
FENCING WITH CGI SHEET ON WOODEN BALLAH SUPPORT,
CONSTRUCTION OF PERMANENT BOUNDARY WALL, BHEL
OFFICE, CEMENT GO - DOWN, FILLING AND COMPACTION
OF ENTIRE PLOT AREA WITH A BLANKET
LAYER OF GOOD EARTH, UP-GRADATION OF FIELD HOSTEL
/ RESIDENTIAL QUARTERS, APPROCHS
ROADS ETC WORK AS PER SPECIFICATION
FOR 2 X 250 MW BARAUNI (
EXTENSION PROJECT ) THERMAL POWER
STATION, PHASE – II , BIHAR
TCN-01
DATED : 12/07/2011
TCN-02
DATED : 19/07/2011
CANCELLED
|
|
(TENDER
NO : PSER:SCT:SDG-E1222:11 DATED : 23/06/2011)
NIT FOR SUPPLY,
ERECTION, TESTING,
COMMISSIONING, OPERATION &
MAINTENANCE ETC OF CONSTRUCTION POWER SYSTEM FOR 2X500
MW UNITS AT SAGARDIGHI STPP, WB
TCN-01
DATED : 12/07/2011
TCN-02
DATED : 19/07/2011
TCN-03
DATED : 22/07/2011
TCN-04
DATED : 23/07/2011
TCN-05
DATED : 26/07/2011
TCN-06
DATED : 02/08/2011
|
|
(TENDER
NO : RE/ADMN/CONTRACT/CAR/2011-01
DATED 25.06.11)
NIT FOR TENDER DOCUMENT FOR HIRING OF VEHICLES ON AS AND WHEN REQUIRED
BASIS
|
|
(TENDER
NO : PSER:PUR:FEX:114(IV):035 DATED : 27/06/2011)
NIT FOR SUPPLY & SUPERVISION OF COMMISSIONING OF THREE NOS. (03)
HYDRO TEST PUMP (450 KG) FOR BHEL PSER’S SITES
(ADHUNIK – 1 NO., ABHIJIT – 1 NO. & DPL DURGAPUR- 1
NO.)
TCN-01
DATED : 12/07/2011
|
|
(TENDER
NO : PSER: PUR: FEX: 127(VI):034 DATED. 27/06/2011)
NIT FOR SUPPLY AND SUPERVISION ASSISTANCE DURING ERECTION AND
COMMISSIONING OF TWELVE NOS.(12) ACID CLEANING PUMP (150 T/HR.) FOR
BHEL PSER’S SITES (ADHUNIK–4 NOS., ABHIJEE – 4 NOS. & DPL
– DURGAPUR- 4 NOS.)
TCN-01
DATED : 12/07/2011
|
|
(TENDER
NO : PSER:SCT:SDG-C1221:11 DATED : 23/06/2011)
NIT FOR PKG-A: CIVIL WORKS OF BORE CAST–IN–SITU PILING, PILE
CAP, PEDESTALS, ETC OF 1X500 MW UNIT # 3 FOR 2X500 MW UNITS AT
SAGARDIGHI STPP, WB.
PKG-B: CIVIL WORKS OF BORE CAST–IN–SITU PILING, PILE CAP,
PEDESTALS, ETC OF 1X500 MW UNIT # 4 FOR 2X500 MW UNITS AT SAGARDIGHI
STPP, WB.
TCN-01
DATED : 05/07/2011
TCN-02
DATED : 11/07/2011
TCN-03
DATED : 13/07/2011
|
|
(TENDER
NO : PSER: PUR: PMX: 230(I):031 DATED. : 21/06/2011
NIT FOR SUPPLY OF ORDINARY
PORTLAND CEMENT (OPC) GR - 43 AS PER IS:8112, AT 1X100
MW GAS BASED POWER PLANT MONARCHAK CCP OF NEEPCO AT TRIPURA (2000MT
+/-30%).
|
|
(TENDER
NO : PSER:SCT:SDG-M1219:11 DATED : 16/06/2011)
NIT FOR MATERIAL MANAGEMENT WORK OF BOILER &
AUXILIARIES , TG & AUXILIARIES; ELECTRICAL SYSTEM , C & I
SYSTEM , NON BHEL SYSTEM , CEMENT , STEEL ETC. FOR 2X500 MW
SAGARDIGHI POWER PROJECT , PHASE-II , UNIT 3 & 4 , WEST BENGAL
TCN-01
DATED : 05/07/2011
TCN-02
DATED : 13/07/2011
TCN-03
DATED : 14/07/2011
CANCELLED
|
|
(TENDER
NO : PSER:PUR:FEX:156(III):030
DATED : 16/06/2011)
NIT FOR SUPPLY
OF FOUR NOS. DRY VAN CONTAINER AT BHEL SITES (KODERMA
TPP, MUZAFFARPUR TPS, & VIZAG TPP ).
|
|
(TENDER
NO : PSER:PUR:PMX:163(VIII):029
DATED : 16/06/2011)
NIT FOR SUPPLY
AND INSTALLATION OF 10 NOS
.PRE-FABRICATED BUNK HOUSE AT BHEL: PSER: MONARCHAK
PROJECT SITE.
TCN-01
DATED : 27/06/2011
TCN-02 DATED :
29/06/2011
TCN-03 DATED :
30/06/2011
CANCELLED
|
|
(TENDER
NO : PSER:SCT:SLB:S1218:11 DATED :13/06/2011)
NIT FOR MANNING OF GATE, REGULATING
ENTRY & EXIT OF VISITORS/ VEHICLES AND WATCHING OF MATERIALS AT
BHEL BHAVAN & OTHER PREMISES OF BHEL IN KOLKATA.
TCN-01
DATED : 20/06/2011
TCN-02
DATED : 28/06/2011
|
|
(TENDER
NO : PSER:SCT:MRK-C1215:11 DATYED : 09/06/2011)
NIT FOR PILING, CIVIL,
STRUCTURAL, ARCHITECTURAL
WORK INCLUDING
FOUNDATION / SUPERSTRUCTURE
OF VARIOUS VARIOUS PLANT EQUIPMENTS/
SYSTEMS/ FACILITIES, NON - PLANT BUILDINGS , MISC CIVIL WORK
ASSOCIATED ELECTRICAL
ENABLING AND MAINTENANCE , FINAL PAINTING ETC
FOR 100 MW GAS BASED COMBINED CYCLE POWER PLANT
AT NEEPCO, MONARCHAK, TRIPURA.
TCN-01
DATED : 25/06/2011
TCN-02
DATED : 01/07/2011
TCN-03
DATED : 04/07/2011
TCN-04
DATED : 04/07/2011
|
|
(TENDER
NO : PSER:SCT:SAL-T1212:11 DATED : 09/06/2011)
NIT FOR ERECTION, TESTING, COMMISSIONING ETC OF STEAM TURBINE &
AUXILIARIES, GENERATOR & AUXILIARIES, PUMPS, PIPING,
MISC EQUIPMENTS ETC FOR 1X250 MW, UNIT #1 AT NTPC, BONGAIGAON
TPP, SALAKATI, DIST-KOKRAJHAR (BATD), ASSAM.
TCN-01
DATED : 04/07/2011
TCN-02
DATED : 01/08/2011
TCN-03
DATED :17/08/2011 CANCELLED
|
|
(TENDER
NO : PSER:SCT:BAR-M1214:11 DATED : 06/06/2011)
NIT FOR
PROVIDING COMPLETE
LOGISTICS
OF VARIOUS TRANSPORTATIONS
ETC AND TRANSPORTATION OF ALL ITEMS FROM PORT OF ORIGIN
AT HALDIA , KOLKATA TO BARH SITE FOR 2 X 660 MW NTPC
BARH STPS STAGE – II PROJECT BARH, PATNA, BIHAR
TCN-01
DATED : 07/06/2011
TCN-02 DATED : 18/06/2011
TCN-03
DATED : 23/06/2011
CANCELLED
|
|
(TENDER
NO : PSER: PUR: FEX: 127(V):025 Dtd. 06/06/2011)
NIT FOR SUPPLY AND SUPERVISION ASSISTANCE DURING
ERECTION AND COMMISSIONING OF EIGHT NOS. (08) ACID
CLEANING PUMP (200 T/HR.) FOR
BHEL PSER’S SITES (BARH SITE – 05 NOS. & BOKARO - A SITE –
03 NOS.)
|
|
(TENDER
NO : PSER:SCT:PAL-E1213:2422 DATED : 30/05/2011)
NIT FOR ERECTION, TESTING, COMMISSIONING ETC OF GT, ST, UAT, MISC
TRANSFORMER, BUS - DUCT, HT/ LT SWGR PANEL, MISC PANEL,
CABLING ETC FOR 2X363.3 MW CCPP AT PALATANA, TRIPURA.
TCN-01
DATED : 16/06/2011
TCN-02
DATED : 20/06/2011
|
|
(TENDER
NO : PSER:SCT:VIZ:F1205:11 DATED 26/05/2011)
NIT FOR HIRING OF TWO (2) NO. TOWER CRANE FOR 2 X 520 MW
HNPCL/ VIZAG TPP, VISHAKHAPATNAM, AP.
TCN-01
DATED : 31/05/2011
TCN-02
DATED : 02/06/2011
|
|
(TENDER
NO : PSER:PUR:PMX:162(VII)020
DATED : 24/05/2011)
NIT FOR SUPPLY OF ORDINARY PORTLAND CEMENT (OPC) GR-43 AS PER IS:8112, FOR BONGAIGAON REFINERY PROJECT LIMITED
(BRPL), PO: DHALIGAON, BONGAIGAON, ASSAM. (1200MT +/-30%).
|
|
(
TENDER NO : PSER-SCT-DBL-Q1200-11 DATED : 20/05/2011
)
NIT FOR PROVIDING SERVICES OF FIELD QUALITY FOR CIVIL , MECHANICAL, BOILER & AUXILIARY AND TG
& AUXILIARY WORKS FOR (A) 1 X 20.28
MW OPEN CYCLE GAS TURBINE (FR 5) POWER PLANT AT DULIAJAN ,
ASSAM ; (B) 1 X 20 MW STG + 1 X 150 TPH
GAS / OIL FIRED BOILER BASED CPP AT IOCL BARAUNI REFINERY & (C) 53 MW COMBINED CYCLE POWER PLANT AT
BCPL/LEPETKATA,ASSAM
TCN-01
DATED : 02/06/2011
|
|
(TENDER
NO : PSER:SCT:PAL-C1210:11 DATED : 20/05/2011)
NIT FOR CIVIL, ARCHITECTURAL ETC WORK OF PART
BALANCE MAIN CIVIL PACKAGE FOR 2X363.3 MW UNITS AT GAS BASED CCPP AT
PALATANA, UDAIPUR,TRIPURA.
|
|
(TENDER
NO : PSER:SCT:LPT-A1202:11 DATED : 18/05/2011)
NIT FOR (I) ERECTION, COMMISSIONING ETC OF ELECTRICAL SYSTEM;
(II) ERECTION, COMMISSIONING ETC CONTROL & INSTRUMENTATION
(C & I) SYSTEM ; (III) ENGINEERING /
DESIGN, MANUFACTURING / PROCUREMENT,
SUPPLY, ERECTION,
COMMISSIONING ETC OF
VENTILATION SYSTEM AND (IV) ENGINEERING/ DESIGN,
MANUFACTURING/ PROCUREMENT, SUPPLY, ERECTION,
COMMISSIONING ETC OF PLANT ILLUMINATION SYSTEM FOR 53 MW
COMBINED CYCLE POWER PLANT AT LEPETKATA, BCPL, ASSAM.
TCN-01
DATED : 04/06/2011
TCN-02
DATED : 09/06/2011
TCN-03
DATED : 16/06/2011
TCN-04
DATED : 03/09/2011
CANCELLED
|
|
(TENDER
NO : PSER:PUR:ONG-S039:11 DATEDT:18-05-11)
NIT FOR TENDER
DOCUMENT FOR REFURBISHMENT
OF OIL RIG (ARMCO REG –TYPE 1320 UE) OF ONGC - AGARTALA
TCN-01
DATED : 27/05/2011
TCN-02
DATED : 02/06/2011
|
|
(TENDER
NO : PSER:SCT:MUZ-B1206:11 DATED : 13/05/2011)
NIT FOR (I) PACKAGE - A: ERECTION,
TESTING, COMMISSIONING, TRIAL RUN, HANDING OVER ETC OF BOILER,
ROTATING MACHINES & DUCT, ESP, CRITICAL PIPING, MISC
PIPING, BOILER INTEGRAL PIPING, INSULATION
& FINAL PAINTING ETC
OF U # 1 FOR 2 X 195 MW UNITS
FOR KBUNL, MUZAFFARPUR PROJECT, BIHAR AND (II)
PACKAGE - B : ERECTION, TESTING, COMMISSIONING, TRIAL RUN,
HANDING OVER ETC OF BOILER, ROTATING
MACHINES & DUCT, ESP, CRITICAL
PIPING, MISC PIPING, BOILER INTEGRAL PIPING,
INSULATION & FINAL PAINTING ETC
OF U # 2 FOR 2X195 MW UNITS FOR KBUNL,
MUZAFFARPUR PROJECT, BIHAR.
TCN-01
DATED : 25/05/2011
TCN-02
DATED : 31/05/2011
|
|
(TENDER
NO : PSER:SCT:HLD-E1196:11 DATED : 13/05/2011)
NIT FOR SUPPLY,
ERECTION, TESTING, COMMISSIONING
AND OPERATION & MAINTENANCE OF
CONSTRUCTION POWER SYSTEM FOR 3X150 MW COAL BASED POWER PLANT , IPCL
HALDIA
TCN-01
DATED : 01/06/2011
TCN-02
DATED : 06/06/2011
TCN-03
DATED : 13/06/2011
|
|
(TENDER
NO : PSER:SCT:DPL-B1198:11 DATED : 13/05/2011)
NIT FOR RECEIPT FROM
STORES, TRANSPORTATION TO WORK SITE, STORAGE/ PRESERVATION AS
REQUIRED, ERECTION, TESTING,
COMMISSIONING, HANDING OVER ETC.
OF BOILER & AUX, ESP,
ROTATING MACHINES,
DUCTING, CRITICAL PIPING,
MISC. PIPING, BOILER
INTEGRAL PIPING, INSULATION, FINAL PAINTING ETC.
AT 1X250 MW UNIT # 8 DPL, DURGAPUR, W.B..
| |